Tımarlı Weir & HEPP (Bank Consultant)

Back Back

Tımarlı Weir & HEPP (Bank Consultant)

Location: Çankırı 
Purpose: Energy 
Transmission Line Length: 19.80 km 
Installed Power: 7,36 MWm / 7,00 MWe 
Number of Units: 3 
Turbine Type: Vertical Axis Kaplan 
Design Discharge: 80.00 m³/s 
Annual Energy Production: 48.00 GWh 
Client: Fibabanka
×