Tımarlı Weir & HEPP (Bank Consultant)
Location: Çankırı
Purpose: Energy
Transmission Line Length: 19.80 km
Installed Power: 7,36 MWm / 7,00 MWe
Number of Units: 3
Turbine Type: Vertical Axis Kaplan
Design Discharge: 80.00 m³/s
Annual Energy Production: 48.00 GWh
Client: Fibabanka