




Melikom HEPP Technical Due Diligence and Consulting for Hepp Acquisition
Location: Rize
Purpose: Energy
Installed Power: 7,75 MWm / 7,60 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Design Discharge: 14.00 m³/s
Annual Energy Production: 39.41 GWh
Client: Fibabanka
Purpose: Energy
Installed Power: 7,75 MWm / 7,60 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Design Discharge: 14.00 m³/s
Annual Energy Production: 39.41 GWh
Client: Fibabanka