




Manyas Dam & HEPP Technical Due Diligence and Consulting for Hepp Acquisition
Location: Balıkesir
Purpose: Energy
Body Type: Clay Core Rockfill
Body Height: 91.00 m
Total Storage Capacity: 428.93 hm³
Installed Power: 20.49 MWm / 20.25 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Design Discharge: 42.00 m³/s
Annual Energy Production: 43.10 GWh
Client: Fina Enerji Holding
Purpose: Energy
Body Type: Clay Core Rockfill
Body Height: 91.00 m
Total Storage Capacity: 428.93 hm³
Installed Power: 20.49 MWm / 20.25 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Design Discharge: 42.00 m³/s
Annual Energy Production: 43.10 GWh
Client: Fina Enerji Holding
