Kayalık HEPP Technical Due Diligence and Consulting for Hepp Acquisition
Location: Erzincan
Purpose: Energy
Installed Power: 6.66 MWm / 5.76 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Design Discharge: 11.00 m³/s
Annual Energy Production: 18.78 GWh
Client: Gama Enerji
Purpose: Energy
Installed Power: 6.66 MWm / 5.76 MWe
Number of Units: 2
Turbine Type: Horizontal Axis Francis
Design Discharge: 11.00 m³/s
Annual Energy Production: 18.78 GWh
Client: Gama Enerji