Kayabeyi Dam and Akıncı HEPP (Bank Consultant)
Location: Ardahan
Purpose: Energy
Stream: Kura River
Body Type: Concrete Faced Rockfill
Body Height: 134.00 m
Installed Power: 87.00 MW
Number of Units: 4 (2+2)
Turbine Type: Vertical & Horizontal Axis Francis
Design Discharge: 56.65 m³/s
Client: Akbank
Purpose: Energy
Stream: Kura River
Body Type: Concrete Faced Rockfill
Body Height: 134.00 m
Installed Power: 87.00 MW
Number of Units: 4 (2+2)
Turbine Type: Vertical & Horizontal Axis Francis
Design Discharge: 56.65 m³/s
Client: Akbank