|
Project Header

Kayabeyi Dam and Akıncı HEPP (Bank Consultant)

Back Back

Kayabeyi Dam and Akıncı HEPP (Bank Consultant)

Location: Ardahan 
Purpose: Energy 
Stream: Kura River 
Body Type: Concrete Faced Rockfill 
Body Height: 134.00 m 
Installed Power: 87.00 MW 
Number of Units: 4 (2+2) 
Turbine Type: Vertical & Horizontal Axis Francis 
Design Discharge: 56.65 m³/s 
Client: Akbank
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top