Karacaören 1 & 2 HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Back Back

Karacaören 1 & 2 HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Location: Burdur 
Purpose: Energy 
Body Type: Zoned Earthfill Dam / Concrete Gravity Single-Arch Dam 
Body Height: 93.00 m / 52.00 m 
Total Storage Capacity: 1234.00 hm³ / 33.77 hm³ 
Installed Power: 32.00 MW + 46.4 MW = 78.40 MW 
Number of Units: 4 (2+2) 
Turbine Type: Vertical Axis Francis 
Design Discharge: 47.60 m³/s + 53.60 m³/s (Total 101.20 m³/s) 
Annual Energy Production: 270.00 GWh 
Client: Gama Enerji
×