|
Project Header

Kadıncık 1 & 2 HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Back Back

Kadıncık 1 & 2 HEPP Technical Due Diligence and Consulting for Hepp Acquisition

Location: Mersin 
Purpose: Energy 
Dam Body Type: Concrete Gravity Dam 
Dam Body Height: 34.00 m 
Installed Power: 70.00 MW + 56.00 MW = 126.00 MW 
Number of Units: 3 (2+1) 
Turbine Type: Vertical Axis Francis 
Design Discharge: 48.00 m³/s + 48.00 m³/s (Total 96.00 m³/s) 
Annual Energy Production: 494.86 GWh 
Client: Gama Enerji
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz

Go to Top