Erenköy Weir and HEPP
Location: Artvin
Purpose: Energy
Weir Type: Without Gate Mass-Body
Total Design Discharge: 15.00 m³/s
Net Head: 170.90 m
Installed Power: 23.196 MWm / 22.50 MWe
Number of Units: 3
Turbine Type: Horizontal Axis Francis
Total Energy: 77.00 GWh
Client: Türkerler İnşaat