Başköy Dam and HEPP
Location: Erzurum – Bingöl
Purpose: Energy
Total Design Discharge: 14.00 m³/s
Net Head: 92.16 m
Installed Power: 11.00 MW
Number of Units: 3
Turbine Type: Horizontal Axis Francis
Client: Anadolum Enerji Üretim
Purpose: Energy
Total Design Discharge: 14.00 m³/s
Net Head: 92.16 m
Installed Power: 11.00 MW
Number of Units: 3
Turbine Type: Horizontal Axis Francis
Client: Anadolum Enerji Üretim