Project Header

Başköy Dam and HEPP

Back Back

Başköy Dam and HEPP

Location: Erzurum – Bingöl 
Purpose: Energy 
Total Design Discharge: 14.00 m³/s 
Net Head: 92.16 m 
Installed Power: 11.00 MW 
Number of Units: 3 
Turbine Type: Horizontal Axis Francis 
Client: Anadolum Enerji Üretim
×
QR Kod

QR kodu telefonunuzla tarayarak akıllı haritayı açabilirsiniz